Alpha Magnetic Spectrometer

Technical Interchange Meeting

CERN Council Chamber

July 23-27, 2007

 

Agenda vs3

Monday July 23, 2007

08:30-09:30

Report to the Collaboration

S. C.C. Ting

09:30-10:00

Report from NASA

T. Martin / NASA

10:00-10:15

Coffee, tea

 

10:15-12:00

Magnet & CGSE

S. Harrison, A. Grechko

12:00-14:00

Lunch

 

14:00-15:15

Report on Electronics

G. Ambrosi, X. Cai, A. Lebedev

15:15-15:30

Coffee, tea

 

15:30-16:00

ACC

T. Kirn

16:00-17:15

Tracker

G. Ambrosi

17:15-17:45

TTCS

J. van Es, Z. He

 

Tuesday July 24, 2007

08:30-09:30

Report on RICH

J. Berdugo

09:30-10:00

Report on TOF

A. Contin

10:15-10:15

Coffee, tea

 

10:15-11:15

Report on ECAL

F. Cervelli, J.P. Vialle

11:15-12:15

Report on TRD

G. Schwering , T. Siedenburg, B. Borgia

12:15-14:00

Lunch

 

14:00-15:00

Test preparation at ESTEC

J. Burger

15:00-18:00

Individual Group Meetings

 

 

Wednesday July 25, 2007

08:30-09:00

Report on Star Tracker

P. Trampus

09:00-09:30

Test Beam preparation

V. Plyaskin

09:30-09:45

Coffee, tea

 

09:45-11:00

Review of Cables and Cabling

A. Lebedev, F. Cadoux

11:00-11:30

Status of Weight issue

A. Kounin

11:30-18:00

Individual Group Meetings

 

 

 

 

 

Thursday July 26, 2007

08:30-09:30

TCS

M. Molina, J. Burger

09:30-10:00

Report on Clean Room

V. Plyaskin

10:00-10:15

Coffee, tea

 

 

AMS Integration Meeting

 

 

Schedule Review & Discussion of critical path items:

J. Heilig, K. Bollweg

10:15-11:00

Pre-integration

 

11:00-11:30

Flight integration

 

11:30-12:00

CAD Model status

- Models delivered & integrated

- Models still needed

R. Becker

12:00-13:00

Lunch

 

13:00-13:40

Current Overall AMS-02 layout:

Status of Holes Allocation on VC & USS

Flight Fastener delivery responsibility

R. Becker

R. Becker

K. Bollweg

13:40-14:00

Layout for Test Beam at CERN

V. Plyaskin, R. Becker

14:00-14:45

Cryomagnet external hardware

- clearance issues with other hardware

USS, & VC, VC shipping crate & PSS

- main on-orbit helium vent location on USS

- Plans for mockups during preintegration

K. Bollweg

 

 

 

 

R. Becker

14:45-15:00

GPS integration

C. Zurbach

15:00-15:15

Coffee, tea

 

15:15-16:15

Thermal vacuum and EMI tests at ESTEC

J. Burger et al.,

Gaetan Piret / ESTEC

16:15-16:45

AMS tools & calibration procedures

C. Gargiulo

16:45-18:00

Thermal blanket current designs, delivery status& integration plans

M. Molina

 

Friday July27, 2007

08:30-10:00

Integration Design Review

- Integration documentation & ADPs

- Description (as safety data pack)

- Waivers, deviations & anomalies

- Historical logs & as-built drawings

- Special safety & functionality instructions

Test procedures & certification documents

- Pressure vessel documentation

- other items

10:00-10:15

10:00-10:15

Potential PSS mod for Zenith radiators

J. Kastelic

10:15-10:30

Coffee, tea

 

10:30-12:15

Cable, fibres & tuning routing status

- Balcony FINAL designs & weight

- All detector cables on USS & VC

- All power cables

- TTCS & TCS tubing

- TAS & ACC fibres

- CAB interference with cabling & loop

heat pipe

F. Cadoux, C. Gargiulo, A. Alvino,

A. Assenza

12:15-13:30

Lunch

 

13:30-13:45

Grounding & Bonding on the USS & VC

J. Kastelic & T. Urban

13:45-14:15

TRD Gas system Ops at CERN, ESTEC& KSC

T. Siedenburg

 

14:15-15:15

Action items review

K. Bollweg

15:15-15:30

Break – coffee, tea