Alpha Magnetic
Spectrometer
Technical
Interchange Meeting
CERN Council
Chamber
July 23-27, 2007
Agenda vs3
|
08:30-09:30 |
Report to the
Collaboration |
S. C.C. Ting |
|
09:30-10:00 |
Report from NASA |
T. Martin / NASA |
|
10:00-10:15 |
Coffee, tea |
|
|
10:15-12:00 |
Magnet & CGSE |
S. Harrison, A. Grechko |
|
12:00-14:00 |
Lunch |
|
|
14:00-15:15 |
Report on Electronics
|
G. Ambrosi, X. Cai, A.
Lebedev |
|
15:15-15:30 |
Coffee, tea |
|
|
15:30-16:00 |
ACC |
T. Kirn |
|
16:00-17:15 |
Tracker |
G. Ambrosi |
|
17:15-17:45 |
TTCS |
J. van Es, Z. He |
|
08:30-09:30 |
Report on RICH |
J. Berdugo |
|
09:30-10:00 |
Report on TOF |
A. Contin |
|
10:15-10:15 |
Coffee, tea |
|
|
10:15-11:15 |
Report on ECAL |
F. Cervelli, J.P. Vialle |
|
11:15-12:15 |
Report on TRD |
G. Schwering , T.
Siedenburg, B. Borgia |
|
12:15-14:00 |
Lunch |
|
|
14:00-15:00 |
Test preparation at ESTEC |
J. Burger |
|
15:00-18:00 |
Individual Group Meetings |
|
|
08:30-09:00 |
Report on Star Tracker |
P. Trampus |
|
09:00-09:30 |
Test Beam preparation |
V. Plyaskin |
|
09:30-09:45 |
Coffee, tea |
|
|
09:45-11:00 |
Review of Cables and
Cabling |
A. Lebedev, F. Cadoux |
|
11:00-11:30 |
Status of Weight issue |
A. Kounin |
|
11:30-18:00 |
Individual Group Meetings |
|
|
|
|
|
|
08:30-09:30 |
TCS |
M. Molina, J. Burger |
|
09:30-10:00 |
Report on Clean Room |
V. Plyaskin |
|
10:00-10:15 |
Coffee, tea |
|
|
|
AMS Integration Meeting |
|
|
|
Schedule Review &
Discussion of critical path items: |
J. Heilig, K. Bollweg |
|
10:15-11:00 |
Pre-integration |
|
|
11:00-11:30 |
Flight integration |
|
|
11:30-12:00 |
CAD Model status - Models delivered &
integrated - Models still needed |
R. Becker |
|
12:00-13:00 |
Lunch |
|
|
13:00-13:40 |
Current Overall AMS-02
layout: Status of Holes Allocation
on VC & USS Flight Fastener delivery
responsibility |
R. Becker R. Becker K. Bollweg |
|
13:40-14:00 |
Layout for Test Beam at
CERN |
V. Plyaskin, R. Becker |
|
14:00-14:45 |
Cryomagnet external
hardware - clearance issues with
other hardware USS, & VC, VC shipping
crate & PSS - main on-orbit helium
vent location on USS - Plans for mockups during
preintegration |
K. Bollweg R. Becker |
|
14:45-15:00 |
GPS integration |
C. Zurbach |
|
15:00-15:15 |
Coffee, tea |
|
|
15:15-16:15 |
Thermal vacuum and EMI
tests at ESTEC |
J. Burger et al., Gaetan Piret / ESTEC |
|
16:15-16:45 |
AMS tools &
calibration procedures |
C. Gargiulo |
|
16:45-18:00 |
Thermal blanket current
designs, delivery status& integration plans |
M. Molina |
|
08:30-10:00 |
Integration
Design Review -
Integration documentation & ADPs -
Description (as safety data pack) -
Waivers, deviations & anomalies -
Historical logs & as-built drawings -
Special safety & functionality instructions Test
procedures & certification documents -
Pressure vessel documentation -
other items |
10:00-10:15 |
|
10:00-10:15 |
Potential
PSS mod for Zenith radiators |
J. Kastelic |
|
10:15-10:30 |
Coffee,
tea |
|
|
10:30-12:15 |
Cable,
fibres & tuning routing status -
Balcony FINAL designs & weight -
All detector cables on USS & VC -
All power cables -
TTCS & TCS tubing -
TAS & ACC fibres -
CAB interference with cabling & loop heat
pipe |
F. Cadoux, C. Gargiulo, A.
Alvino, A. Assenza |
|
12:15-13:30 |
Lunch |
|
|
13:30-13:45 |
Grounding
& Bonding on the USS & VC |
J. Kastelic & T. Urban |
|
13:45-14:15 |
TRD
Gas system Ops at CERN, ESTEC& KSC |
T. Siedenburg |
|
14:15-15:15 |
Action
items review |
K. Bollweg |
|
15:15-15:30 |
Break
– coffee, tea |
|