Action item list. Meeting among S. Breon (GSFC), M. Molina (CGS), R. Schlitt (OHB) CERN, 10th May 2002 Evaporator tentative layout and interface has been provided by GSFC. AI 1: OHB to provide feedback on this layout - end of May AI 2: CGS to size heaters - July AI 3: LMSO to provide AMS02 CAD model to OHB system for accomodation studies of CPL lines from the cryocoolers to the radiator. Newer version of the CAD model is expected to be released within 1 month (mid-June) to allow M-structure integration. The present model will be delivered ASAP for preliminary studies. LMSO to provide existing crycooler CAD model. AI 4: Bracket concept will be developed next months: OHB will proceed in the evaporator design on the basis of their existing preliminary envelope, to be provided by GSFC - END OF JUNE. AI 5: S. Breon has confirmed that GSFC will provide bolts to attach the evaporator to the cryocooler. They are using English (Imperial) fasteners, so don't have a strong preference. She suggests using M4 fasteners, as discussed at CERN. To be confirmed by OHB with AI 5 - MID JUNE. AI 6: R. Schlitt suggest to reduce bolts size and pattern (M4 instead of M5): evaporator ICD finalization expected for mid June. AI 7: LMSO (B. Chittur) states that the evaporator fixation is non-safety critical , due to small mass of the evaporator. AI 8: OHB to investigate heaters and thermostats accomodation on evaporator body and GSFC the same for the cryocooler body (after CGS sizing, tentative date = September).